Location: Lot E, Dong Van II Industrial Park, Duy Tin District, Ha Nam Province.
Total area: 50.000,0 m2
Detailed of project description:
- Construction slab area: 23.225,96 m2
- Client: Greenfeed Vietnam Co.; Ltd.
Consultancy Services:
- Topographic survey,Geological survey.
- Detail design
- Construction supervision